Rates | What's New | Board
Existing Sewer User Rates
Residential User Rate- $39.75 per month per EDU (equivalent Dwelling Unit)
Non-residential User rate- $39.75 per month per EDU (equivalent Dwelling Unit)
1 EDU equals 228 gallons.
***********************************************************************
Connection Fees:
$500.00 For the construction of the stub and the inspection of the same from the Authority’s main sewer to the property line or curb stop.
Tapping Fees
:Special Purpose Fees
$1,000 per EDU special purpose fee to be collected for connections in the Lumber Street and Burd Run Interceptors.
Reimbursement Fees
Reimbursement fees are collected and remitted to developers who participated in the financing and construction of the sewer line in certain areas of the Township. Most of the reimbursement fees are for connections whose flow is treated at the Southwest Treatment Plant in Derry Township. The rate per EDU varies between $162.00 per EDU and $368.00 per EDU.
Other Fees
Inspection fee-$250.00 Previous lateral run from sewer system to edge of Township right-of-way has been installed by developer and previously inspected.
Mobile Home re-inspection fee $50.00
Other re-inspection fee $50.00 (sewer repair permit)